Search this site
PICMG Open Modular Computing Specifications
Specifications
Purchase Specifications
Product Listings
Document Library
News and Events
About PICMG
Membership
New Initiatives
Members Only
Home

PICMG Specifications

Click here to find out how to order published specifications.  Some specifications have short form versions available for download.  Click here to see downloadable short form specifications.  Some specifications have pages with more information.  Click on the specification name to go to that page. 

PICMG Logos are trademarks of PICMG. The Specification Logos may be used by non-members under certain circumstances but the PICMG logo is reserved for use by Executive and Associate members in good standing. Click here for PICMGs policy on trademark and logo usage. Members can download logos from the members section of the web site. Non-members can click here to request logos associated with some PICMG specifications.

Warning!

Draft specifications and ECR’s are under the control of the subcommittee, if active. It is PICMG’s policy to prohibit claims of compliance with respect to a specification under development. Any such claims must be understood as applying to a draft, which is subject to change.

Show ALL Specifications

Bus: AdvancedTCA®

PICMG – No.

Name

Revision
ECN

Date

Status

Description

           

3.0

AdvancedTCA® (Base Specification)

Rev 3.0

24-Mar-08

Adopted

Incorporates ECN’s to R2.0 and additional CR’s

Rev 2.0

18-Mar-05

Obsolete

Replaced by Rev 3.0

R2 ECN001

15-Jun-05

Obsolete

Adds ShMC Cross Connect. Replaced by Rev 3.0

R2 ECN002

29-Apr-06

Obsolete

Replaced by Rev 3.0

Rev 1.0

30-Dec-02

Obsolete

The PICMG 3.0 “core” specification specifies board, backplane and shelf mechanicals; power distribution and the connectivity required for system management. Replaced by Rev 2.0.

R1 ECN 001

21-Jan-04

Obsolete

Changes incorporated in Rev 2.0

3.1

AdvancedTCA® Ethernet

Rev 2.0

3-Aug-2012

Adopted

Develops enumerated requirements that incorporate 1000BASE-KX, 10GBASE-KX4 and 10GBASE-KR fabric options into Revision 2.0 of the PICMG 3.1 specification.

Rev 1.0

22-Jan-03

Adopted

Defines how Ethernet and Fibre Channel are mapped onto PICMG 3.0.

3.2

AdvancedTCA® InfiniBand

Rev 1.0

22-Jan-03

Adopted

Defines how InfiniBand transport is mapped onto PICMG 3.0

3.3

AdvancedTCA® StarFabric

Rev 1.0

21-May-03

Adopted

Defines how StarFabric transport is mapped onto PICMG 3.0

3.4

AdvancedTCA® PCI Express

Rev 1.0

21-May-03

Adopted

Defines how PCI Express and PCI Express Advanced Switching transport is mapped onto PICMG 3.0

3.5

AdvancedTCA® Serial RapidIO

Rev 1.0

9/21/2005

Adopted

Defines how Serial Rapid I/O is mapped onto PICMG 3.0

3.6

AdvancedTCA® PRS

Rev 1.0

1/1/0

Abandoned

Defines how Packet Routing Switch (PRS) is mapped onto PICMG 3.0

3.8

AdvancedTCA Rear Transition Module

Rev 1.0

09/05/2011

Adopted

Defines a set of connectors for data and management on the RTM described in PICMG 3.0 R3.0.

3.7

AdvancedTCA® Extension

Rev 1.0

TBD

Active

Develops extensions to AdvancedTCA for use in enterprise applications.

phyTCA

xTCA™ for Physics

Rev 1.0

TBD

Active

Develops additional features and options for AdvancedTCA and MicroTCA for use in particle physics research including data collection and accelerator control systems.

IRTM.0

Intelligent Rear Transition Module

Rev 1.0

1/1/2011

Adopted

Standardizes support for RTMs as manage FRUs.

ATCA300

ATCA300

Rev 1.0

TBD

Abandoned

Defines a standard approach for implementing AdvancedTCA in 300mm ANSI and ETSI environments.

Notes
Completed specifications are those for which at least one revision has been submitted to the Executive Membership and adopted. In a few cases multiple revisions have been completed, resulting in the listing of obsolete revisions.

Completed PICMG® specifications are distributed to all PICMG members as a benefit of membership, and any manufacturer may make claims of compliance. PICMG does not endorse these claims, or assume responsibility for any failure to meet claims of compliance.

Specifications under development are those for which a subcommittee has been, or is in the process of being, formed. In some cases the summary indicates that subsequent revisions of completed specifications are under development. In other cases, where no completed specification is shown the document under development is the first on that subject.

Where available, links are provided from specification descriptions to short form versions of specifications. Short form specifications are provided for information only – do not attempt to design from these documents. The short form documents are subsets of their respective specifications. For complete guidelines on designs and implementations, the full specifications are required.

Warning!

Draft specifications and ECR’s are under the control of the subcommittee, if active. It is PICMG’s policy to prohibit claims of compliance with respect to a specification under development. Any such claims must be understood as applying to a draft, which is subject to change.